Feasibility Study & NI 43-101



Samuel Services
Samuel Engineering performed value engineering and detailed design for the 2017 updated feasibility study of the Amulsar Gold Project in Armenia. The team delivered multi-discipline engineering across process, civil/structural, mechanical, electrical, and controls scopes while conducting capital and operational cost analyses. These efforts identified cost-saving opportunities without compromising environmental or social performance.
Project Description
The Amulsar Gold Project underwent an updated NI 43-101 feasibility study to refine the processing flowsheet and reduce capital and operating costs. The plant incorporated ore crushing, heap leaching with cyanide, carbon-in-pulp adsorption-desorption-recovery, refining, and supporting utilities, including a newly designed leach pad system.
